30 Sep
Project Mechanical Engineer

•.Leading the HVAC site team as an HVAC Engineer.
•.Following up the Installation works and allocation of workforce as per demand in the Course of the project.
•.Material ordering as per the approved material submittals & spec.
•.Coordination with Firefighting and Electrical works and submitting reports of day by day activities to the Project Manager.
•.Material coordination and close interaction with consultants for preparation of shop drawings and as built drawings.
•.Chilled water pipe flushing & getting approval.
•.Involving in the Air Balancing and Chilled Water Balancing activities and getting the report from the appointed third party and submitting it to the consultant for witnessing.
•.Preparation of Asset Register & Operation and Maintenance Manuals.
•.Preparation of Sub contractor work orders and certifying the Bills as per the works done at site and submitted invoices.
•.Completing the handing over procedures to get TOC from the client.
•.As an HVAC Engineer, involved in the following activities.
•.Leading the site team & placing orders for materials as per approved material submittals & spec.
•.Co-coordinating with various suppliers for the speedy delivery of the materials ordered and clarifying the doubts of the suppliers to deliver the correct materials.
•.Making site visit to check the workmanship of installations and ensure that the works are carried out as per the approved method statement.
•.Conducting an internal meeting on weekly basis for all in an HVAC team (Supervisors & foremen) to update the progress achievements and assigning new targets.
•.Follow up the works at site regularly and arranging for the required materials in time inorder to move the works non stopped.
•.Coordinating with consultants during inspections.
•.Coordinating with third parties assigned for the T & C activities of the project.
•.Coordinating with third party regarding the flushing activity.
•.Having discussions and healthy arguments with consultants incase of required.
•.Preparation and submission of as built drawings and O & M manuals to consultant for approval.
•.Having the HVAC team to attend the safety meetings and tool box talks on weekly basis and on any requirement to ensure the personal safety of workers and subordinates.